- Raised race boxing is installed during construction to give operators improved reach into the working race.
- A channel groove is boxed into the slab area to allow feet under the race, ultimately getting operator closer to the sheep with less stress on their legs and back.
- The slab sits up on a galvanised section and is reinforced with fibre mesh to strengthen the overhanging lip.